Updating...
Skip to main content
Filter your search by category. Current category:
All
All
Knowledge Base
Service Catalog
Search the client portal
Search
Sign In
Show Applications Menu
Blue Ridge Portal
Sign In
Search
Home
Services
Knowledge Base
More Applications
Skip to Knowledge Base content
Search
Articles
Blank
Knowledge Base
Buildings and Grounds
Chiller PM tasks and procedures
Chiller PM tasks and procedures
___ De-energize, lock out, and tag electrical circuit.
Condenser:
___ Remove debris from air screen and clean underneath unit.
___ Pressure wash coil with proper cleaning solution.
___ Straighten fin tubes with fin comb.
___ Check electrical connections for tightness.
___ Check for mounting for tightness.
___ Check for corrosion. Clean and treat with inhibitor as needed.
___ Clean fan blades.
___ Perform required lubrication and remove old or excess lubricant.
Compressor(s):
___ Check compressor oil level.
___ Run machine; check action of controls, relays, switches, etc. to see that:
___ Refrigerant sight glasses show full charges and low moisture (green spot reading)….contact the service contractor if either of these conditions are not acceptable.
___ Compressor(s) run at proper settings.
___ Suction and discharge pressures are proper.
___ Outlet water temperature is set properly.
___ Check and adjust vibration eliminators.
Controls:
___ Check operation of all relays, pilot valves, and pressure regulators.
Fan Motors:
___ Check ventilation ports for soil accumulations; clean if necessary.
___ Clean exterior of motor surfaces of soil accumulation.
___ Lubricate bearings according to manufacturer’s recommendations.
___ Remove filer and drain plugs (use zerk fittings if installed).
___ Free drain hole of any hard grease (use piece of wire if necessary).
___ Add grease. Use good grade lithium base grease unless otherwise specified.
___ Check motor windings for accumulation of soil. Blow out with low pressure air or vacuum as needed.
___ Check hold-down bolts and grounding straps for tightness.
___ Remove tags, start unit, and check for vibration or noise
___ Clean up work area and remove trash.
___ Record the time taken to service and the material used on the PM work order.
Sign in to leave feedback
0 reviews
Blank
Blank
Blank
Blank
Print Article
Deleting...
×
Share
Recipient(s)
- separate email addresses with a comma
Message
Press Alt + 0 within the editor to access accessibility instructions, or press Alt + F10 to access the menu.
Check out this article I found in the Blue Ridge Portal knowledge base.<br /><br /><a href="https://help.vccs.edu/TDClient/3184/BRCCPortal/KB/ArticleDet?ID=151805">https://help.vccs.edu/TDClient/3184/BRCCPortal/KB/ArticleDet?ID=151805</a><br /><br />Chiller PM tasks and procedures